| BMC OTOMOTİV İZMİR | 2017 | İZMİR | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 480 M3/DAY |
| ASO 2. VE 3. ORGANİZE SANAYİ BÖLGESİ 2.ETAP 2. KISIM ATIKSU ARITMA TESİSİ | 2024 | ANKARA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 5000 M3/DAY |
| BOSCH SAN TİC A.Ş. BU4 FABRİKASI ATIKSU ARITMA TESİSİ | 2009 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL | 24 M3/DAY |
| NOBEL İLAÇ ÖZBEKİSTAN | 2017 | ÖZBEKİSTAN | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 120 M3/DAY |
| NOBEL İLAÇ KAZAKİSTAN | 2016 | KAZAKİSTAN | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 120 M3/DAY |
| AKFA GROUP ÖZBEKİSTAN | 2023 | ÖZBEKİSTAN | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 60 M3/DAY |
| KOSKİ SEYDİŞEHİR İLÇESİ ATIKSU ARITMA TESİSİ | 2018 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 7500 M3/DAY |
| 5M OTOMOTİV | 2008 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 5 M3/DAY |
| KONYA BÜYÜKŞEHİR BELEDİYESİ KATI ATIK DÜZENLİ DEPOLAMA SAHASI SIZINTI SUYU ARITMA TESİSİ | 2018 | KONYA | CONSTRUCTION OF GARBAGE LEACHATE WASTEWATER TREATMENT PLANT | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 180 M3/DAY |
| TÜRK TRAKTÖR ERENLER SAKARYA FABRİKASI | 2024 | SAKARYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 120 M3/DAY |
| BEYÇELİK GESTAMP | 2024 | ROMANYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 96 M3/DAY |
| KARA HOLDİNG | 2024 | GAZİANTEP | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 60 M3/DAY |
| NOBEL İLAÇ | 2024 | DÜZCE | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 10 M3/DAY |
| MERSİN SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜ FINDIKPINARI MAHALLESİ ATIKSU ARITMA TESİSİ | 2024 | MERSİN | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 900 M3/DAY |
| MERSİN SU VE KANALİZASYON İDARESİ GENEL MÜDÜRLÜĞÜ SİPAHİLİ İLÇESİ ATIKSU ARITMA TESİSİ | 2024 | MERSİN | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 600 M3/DAY |
| ANADOLU ISUZU OTOMOTİV SANAYİİ VE TİCARET A.Ş. | 2024 | SAKARYA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 540 M3/DAY |
| ANKARA UZAY HAVACILIK | 2024 | ANKARA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 4000 M3/DAY |
| AKINAL SENTETİK TEKSTİL SAN. VE TİC. A.Ş. | 2024 | GAZİANTEP | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 4000 M3/DAY |
| YAMAS YAŞAR MAKİNA KALIP OTO YEDEK PARÇA SAN. VE TİC. A.Ş. | 2023 | KARACABEY/BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 150 M3/DAY |
| DENİZ SU VE ATIK SU ARITIM İNŞ. SAN. VE TİC. A.Ş. | 2022 | AYDIN | MECHANICAL EQUIPMENT MANUFACTURING | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL | 500 M3/DAY |
| SAUERRESIG BASKI ÖNCESİ HAZIRLIK SİSTEMLERİ TİC. A.Ş. | 2022 | İZMİR | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 75 M3/DAY |
| CANSAN ALÜMİNYUM A.Ş. | 2022 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 384 M3/DAY |
| YALOVA İMES OSB | 2021 | YALOVA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 195 M3/DAY |
| ASO 2. VE 3. ORGANİZE SANAYİ BÖLGESİ 2.ETAP ATIKSU ARITMA TESİSİ | 2021 | ANKARA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 2500M3/DAY |
| ULUKAN BOYA SAN. VE TİC. LTD. ŞTİ. | 2021 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 200 M3/DAY |
| SALİHLİ ORGANİZE SANAYİ BÖLGE MÜDÜRLÜĞÜ | 2021 | MANİSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL | 16000 M3/DAY |
| KOSKİ TUZYAKA MAHALLESİ ATIKSU ARITMA TESİSİ | 2021 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 400 M3/DAY |
| KOSKİ GÖLYAZI MAHALLESİ ATIKSU ARITMA TESİSİ | 2021 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 400 M3/DAY |
| KOSKİ ÖMERANLI MAHALLESİ ATIKSU ARITMA TESİSİ | 2021 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1500 M3/DAY |
| KOSKİ CİHANBEYLİ İLÇESİ ATIKSU ARITMA TESİSİ | 2021 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 4500 M3/DAY |
| POLATLI ORGANİZE SANAYİ BÖLGESİ | 2020 | ANKARA | CONSTRUCTION AND OPERATION OF WASTEWATER TREATMENT PLANT | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 2000 M3/DAY |
| KOSKİ SARAYÖNÜ İLÇESİ ATIKSU ARITMA TESİSİ | 2020 | KONYA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 3500 M3/DAY |
| VİG MAKİNA SAN.VE TİC.A.Ş. | 2019 | ROMANYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 480 M3/DAY |
| BEŞLER CAM ELYAF SAN. A.Ş. | 2019 | KAYSERİ | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 360 M3/DAY |
| ARSLAN ALÜMİNYUM SAN. TİC. A.Ş. | 2019 | BİLECİK | DUMPING SITE SURFACE WATER TREATMENT PLANT CONSTRUCTION WORK | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 1000 M3/DAY |
| SİVAS 1. OSB BAŞKANLIĞI | 2019 | SİVAS | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT PROJECT DESIGN | PROJECTING | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 8000 M3/DAY |
| NEVŞEHİR OSB | 2019 | NEVŞEHİR | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 1000 M3/DAY |
| RUSCAM LLC. | 2019 | RUSYA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 400 M3/DAY |
| GEBKİM – KOCAELİ GEBZE (KİMYA) İHTİSAS ORGANİZE SANAYİ BÖLGESİ | 2017 | KOCAELİ | | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 2000 M3/DAY |
| ASO 2. VE 3. ORGANİZE SANAYİ BÖLGESİ 1.ETAP ATIKSU ARITMA TESİSİ | 2017 | ANKARA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION AND OPERATION | CONSTRUCTION/MECHANICAL/ELECTRICAL/OPERATION | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 2000 M3/DAY |
| HİDROMEK | 2017 | ANKARA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 75 M3/DAY |
| ODAŞ ELEK. TERMİK | 2017 | ÇANAKKALE | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 360 M3/DAY |
| ITT GLOBAL SERVİS HİZMETLERİ | 2016 | KOCAELİ | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 120 M3/DAY |
| EDİRNE SUBAŞI BELEDİYESİ | 2016 | EDİRNE | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 500 M3/DAY |
| DEMİSAŞ | 2016 | BİLECİK | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | SLUDGE DEWATERING | 2 M3/DAY |
| CAN METAL | 2016 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 75 M3/DAY |
| AQUA KITCHEN BATH DESIGN LTD.ŞTİ. | 2016 | ABD | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 96 M3/DAY |
| İNŞEL YAPI TEKNİK DONATIM SİSTEMLERİ LTD. ŞTİ. | 2016 | ÖZBEKİSTAN | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 60 M3/DAY |
| 3 M İNOVASYON ÇORLU | 2016 | TEKİRDAĞ | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 75 M3/DAY |
| KENTPAR OTOMOTİV | 2016 | KONYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 120 M3/DAY |
| HOSAB HASANAĞA ORGANİZE SANAYİ BÖLGE MÜDÜRLÜĞÜ | 2016 | BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CAPACITY INCREASE CONSTRUCTION WORK | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 3500 M3/DAY |
| ARÇELİK BEYLİKDÜZÜ | 2015 | İSTANBUL | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT REVISION WORKS | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+BIOLOGICAL | 300 M3/DAY |
| SİSTEM REKLAMCILIK | 2015 | İSTANBUL | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 72 M3/DAY |
| SAMSON VANA | 2015 | İSTANBUL | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 72 M3/DAY |
| LEZZO GIDA | 2015 | BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1800 M3/DAY |
| CARREFOUR BURSA | 2015 | BURSA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 150 M3/DAY |
| CANEL OTOMOTİV | 2015 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 180 M3/DAY |
| BANDIRMA OSB | 2014 | BANDIRMA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1500 M3/DAY |
| İNDEC ENDÜSTRİYEL RENK ÜRETİM VE PLASTİK BOYAMA SİSTEMLERİ SAN. TİC. LTD. ŞTİ. | 2014 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 10m³ DAY |
| ANADOLU CAM YENİ ŞEHİR | 2014 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 180 M3/DAY |
| BP GEMLİK | 2014 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | MECHANICS / ELECTRICITY | PHYSICAL+CHEMICAL | 120 M3/DAY |
| TIRSAN TREYLER | 2014 | ADAPAZARI | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 440 M3/DAY |
| DİLOVASI İMES OSB | 2014 | GEBZE/KOCAELİ | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 360 M3/DAY |
| ÇANAKKALE SERAMİK | 2013 | ÇANAKKALE | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECTING | CHEMICAL+MUD DEWATERING | 3600M3/DAY |
| BURSA SERBEST BÖLGESİ (BUSEB) | 2013 | BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1000 M3/DAY |
| CARREFOUR ANKARA | 2013 | ANKARA | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 100 M3/DAY |
| İSTANBUL CİLA VE NİKELAJCILAR SİTESİ | 2012 | İSTANBUL | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 300 M3/DAY |
| İNCİ MAKİNA KİMYA RUSYA YAĞ FABRİKASI | 2012 | RUSYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 60 M3/DAY |
| ESKİŞEHİR YAĞ SANAYİ | 2012 | ESKİŞEHİR | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 120 M3/DAY |
| ENTERNASYONEL GRAVÜR | 2012 | İZMİR | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL + SLUDGE DEWATERING | 60 M3/DAY |
| TADAL ZEYTİNCİLİK | 2012 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 75 M3/DAY |
| MAN TÜRKİYE | 2012 | ANKARA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 10 M3/DAY |
| CARREFOUR İÇERENKÖY | 2012 | İSTANBUL | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 200 M3/DAY |
| MBH GIDA | 2011 | KEMALPAŞA/BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 600 M3/DAY |
| GRANİSER SERAMİK | 2011 | AKHİSAR/MANİSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 3600M3/DAY |
| BOSCH FREN SİSTEMLERİ | 2011 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL | 5m³/day |
| BİLECİK 1. OSB MÜDÜRLÜĞÜ | 2010 | BİLECİK | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 4500 M3/DAY |
| SANiCA BORU | 2010 | İSTANBUL | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 50 M3/DAY |
| SANiCA ISI | 2010 | İSTANBUL | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 50 M3/DAY |
| ÇİLEK MOBİLYA A.Ş. | 2010 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 5M3/DAY |
| SİRENA MARİNE DENİZCİLİK | 2010 | BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 5M3/DAY |
| SANÇİM BİLECİK ÇİMENTO | 2010 | BİLECİK | DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 100 M3/DAY |
| HOSAB HASANAĞA OSB | 2010 | BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | CONSTRUCTION/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1000 M3/DAY |
| SİNCAN CEZAEVİ | 2010 | ANKARA | DOMESTIC WASTEWATER TREATMENT PLANT OPERATION | BUSINESS | PHYSICAL+BIOLOGICAL+SLUDGE DEWATERING | 1500 M3/DAY |
| TKİ KÜTAHYA İŞLETMELERİ | 2010 | KÜTAHYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+BIOLOGICAL | 200 M3/DAY |
| E.Ü.A.Ş. TERMİK SANTRALİ TUNÇBİLEK | 2009 | KÜTAHYA | CHEMICAL DOSING SYSTEM CONSTRUCTION WORK | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL | 30 M3/DAY |
| HİSARLAR MAKİNA SAN. TİC. A.Ş. | 2009 | ESKİŞEHİR | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 300 M3/DAY |
| MAKİNE VE KİMYA ENDÜSTİRİSİ KIRIKKALE PİRİNÇ FABRİKASI | 2009 | KIRKKALE | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 120 M3/DAY |
| KARSAN OTOMOTİV | 2008 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 720 M3/DAY |
| ŞETAT MADENCİLİK | 2008 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+SLUDGE DEWATERING | 7200 M3/DAY |
| GRANİSER | 2008 | AKHİSAR/MANİSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 3000 M3/DAY |
| LASPAR KAUÇUK | 2008 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 200 M3/DAY |
| OMSA OTOMOTİV | 2008 | BURSA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 5 M3/DAY |
| KAZCIOĞLU OTOMOTİV | 2008 | TAVŞANLI/KÜTAHYA | INDUSTRIAL WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 25 M3/DAY |
| ASİL ÇELİK | 2007 | BURSA | ROLLING MILL WATER PRODUCTION FACILITY CONSTRUCTION WORK | PROJECT DESIGN/MECHANICAL/ELECTRICAL | CHEMICAL+MUD DEWATERING | 16800 M3/DAY |
| KIRPART A.Ş. | 2006 | ORHANGAZİ/BURSA | INDUSTRIAL AND DOMESTIC WASTEWATER TREATMENT PLANT CONSTRUCTION | PROJECT DESIGN/MECHANICAL/ELECTRICAL | PHYSICAL+CHEMICAL+BIOLOGICAL+SLUDGE DEWATERING | 30 M3/DAY |